From Level 0
Insights on commissioning done right, from design to handover.
Modes We Catch Early
by J.J. Malloy | November 17, 2025 | Uncategorized | 0 Comments
In commissioning, the difference between a smooth handover and a costly delay often comes down to…
Predict Handover Success
by J.J. Malloy | November 10, 2025 | Uncategorized | 0 Comments
Commissioning (Cx) isn’t about paperwork, checklists, or ribbon-cuttings. It’s about proof,…
Continuous Commissioning in Action
by J.J. Malloy | November 3, 2025 | Uncategorized | 0 Comments
Levels 0–5 take a facility from design through integrated system testing. But commissioning…
Proving the Whole Facility
by J.J. Malloy | October 27, 2025 | Uncategorized | 0 Comments
Levels 0–4 are about aligning design, verifying components, and proving systems work. But none of…
Proving the System Delivers
by J.J. Malloy | October 20, 2025 | Uncategorized | 0 Comments
By Level 3, we’ve confirmed that systems start, stop, and handshake correctly. But a data…
Making the Pieces Work Together
by J.J. Malloy | October 14, 2025 | Uncategorized | 0 Comments
By Level 2, every breaker, pump, UPS, and CRAH should be proven correct and safe. But a data…
Where the Factory Meets the Field
by J.J. Malloy | October 6, 2025 | Uncategorized | 0 Comments
By the time equipment arrives onsite, the project has already invested heavily in…
Proving It Before It Ships
by J.J. Malloy | September 30, 2025 | Uncategorized | 0 Comments
Most commissioning programs get judged at the site. But the truth is, many failures are already…
The Forgotten Foundation of Data Center Commissioning
by J.J. Malloy | September 23, 2025 | Uncategorized | 0 Comments
Most people think commissioning begins when equipment arrives onsite or when generators spin up…