From Level 0

Insights on commissioning done right, from design to handover.

Modes We Catch Early

In commissioning, the difference between a smooth handover and a costly delay often comes down to…

Predict Handover Success

  Commissioning (Cx) isn’t about paperwork, checklists, or ribbon-cuttings. It’s about proof,…

Continuous Commissioning in Action

  Levels 0–5 take a facility from design through integrated system testing. But commissioning…

Proving the Whole Facility

Levels 0–4 are about aligning design, verifying components, and proving systems work. But none of…

Proving the System Delivers

  By Level 3, we’ve confirmed that systems start, stop, and handshake correctly. But a data…

Making the Pieces Work Together

By Level 2, every breaker, pump, UPS, and CRAH should be proven correct and safe. But a data…

Where the Factory Meets the Field

  By the time equipment arrives onsite, the project has already invested heavily in…

Proving It Before It Ships

Most commissioning programs get judged at the site. But the truth is, many failures are already…

The Forgotten Foundation of Data Center Commissioning

Most people think commissioning begins when equipment arrives onsite or when generators spin up…